The week following the delivery of the trusses, the crew worked on rolled them into position.
At this point 80% of them are in place. A few tails, hips and peaks still to be added.
The peak of the roof still needs to be added. The trusses would have been to big, so they were broken down into seperate pieces for the ride down to San Diego.